Your electrical installation is the lifeblood of your property and represents significant value. An EICR (Electrical Installation Condition Report) is the health check that keeps it safe, reliable, and compliant.

Whether you’re a landlord, home buyer, or commercial property manager, an EICR identifies hidden faults and early signs of wear that could lead to costly damage, power loss, or even fire if left unchecked. By uncovering problems before they escalate, we help you save money, ensure safety, and maintain the value of your property — giving you complete confidence that your electrical installation is in trusted hands.

As a NICEIC Approved Contractor, we don’t just tick boxes — we help you protect your investment, delivering EICRs that go beyond compliance, undertaking thorough inspections and testing of your electrical installation, providing you with feedback which cuts the jargon in language you'll understand.

Book your Electrical Installation Condition Report with SIQA Group.

Electrical Inspection (EICR) Booking Form

Step 1 of 3: About You

I am the property's....

WHAT PEOPLE SAY

Pensive Coffee Time

Philip T

Very happy. I had a tricky situation that needed rectifying and whilst other electricians offered a fudge, Benson went out of his way to contact and chase the relevant LBC. Regarding the work, was only testing required so cannot comment too much but he was prompt, thorough and got the necessary paperwork done very quickly.

Fashion Photography

Shelley

I had a great experience with Benson. He was reliable, on time, flexible and a real expert. I am completely renovating my home and he could see the 'bigger picture' of the whole project and advise accordingly. Definitely recommended!!!

Rock Climbing Instructor

A job well done.

The team were very accommodating to my schedule, arrived promptly and were very pleasant & professional to deal with.

Terms & Conditions for Electrical Installation Condition Reports (EICRs)

(Provided by SIQA Group Limited)

1. Booking and Confirmation

1.1 EICR inspections can be requested via our online booking form.
1.2 Once your enquiry is received, a qualified SIQA Group Limited engineer will contact you to:

  • Confirm the property type and approximate size,

  • Discuss your preferred dates and available time slots,

  • Provide a final quotation based on the information supplied.

1.3 A confirmation email will then be sent outlining the agreed inspection date, estimated duration, and confirmed cost.

2. Access Requirements

2.1 The customer (or an authorised representative) must ensure safe and unrestricted access to:

  • All areas of the electrical installation,

  • The main electrical cut-out and supply meter,

  • All distribution boards, consumer units, and accessible circuits.

2.2 Access issues or delays caused by the customer may result in additional call-out charges or rescheduling fees.

3. Power Interruption During Testing

3.1 Please note that during an EICR inspection, power will be turned on and off intermittently throughout the testing period.
3.2 It is the customer’s responsibility to ensure that any sensitive equipment or appliances are safely shut down or disconnected prior to testing.

 

4. Completion and Reporting Process

4.1 Upon completion of the inspection, a Draft EICR Report will be sent via email.
4.2 The draft confirms that the inspection has been undertaken and allows you to verify details such as property address, client name, and contact information.
4.3 The invoice for the EICR will be issued at this stage.
4.4 Once payment is received and any corrections to client details are confirmed, a Final EICR Report will be issued.
4.5 If the report identifies any defects or non-compliances, a list of remedial actions will be provided for your review and approval.

 

5. Payment Terms

5.1 Payment for the EICR is due upon receipt of the draft report and invoice, unless otherwise agreed in writing.
5.2 The final report will be released once full payment has been received.
5.3 Late or non-payment may result in delays or cancellation of any related remedial works.

 

6. Cancellations and Rescheduling

6.1 Cancellations and rescheduling can be made up to 2 hours before scheduled EICR slot are free of charge.
 

7. Liability

7.1 SIQA Group Limited will carry out the inspection in accordance with the latest edition of BS 7671 Wiring Regulations and IET Guidance Note 3.
7.2 Our responsibility is limited to the inspection and testing of the existing electrical installation as found.
7.3 We are not responsible for any pre-existing faults, hidden wiring defects, or system failures unrelated to the inspection.

8. Certification and Records

8.1 The EICR report is an assessment of the electrical installation’s condition at the time of testing.
8.2 It does not guarantee future performance or safety beyond the date of issue.
8.3 Customers are advised to retain their report and arrange re-testing as recommended.

9. Governing Law

These Terms & Conditions are governed by and construed in accordance with the laws of England and Wales.

Contact

For any questions regarding your booking or these terms, please contact:
Email: team@siqagroup.co.uk

Phone: +447415 151047

SIQA Group Limited

Registered in England No.: 13950743       VAT Registration No.: 431 2985 00

©2025 by SIQA Group Limited. Proudly created with Wix.com

bottom of page